Fuel container

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8435698
APP PUB NO 20090130531A1
SERIAL NO

11997549

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel container 1 comprises: a container main body 2 in which a liquid fuel 4 is housed and fuel exhausting ports 24 and 31 to exhaust the liquid fuel 4 to the outside is formed; a following auxiliary member 71 which is solid, and situated on an end side of the liquid fuel 4 in the container main body 2, the following auxiliary member 71 moving to the sides of the fuel exhausting ports 24 and 31 as the liquid fuel 4 is exhausted; and a following body 5 situated on the end side of the liquid fuel 4, and packed in a space formed by an inner peripheral surface of the container main body 2 and an outer peripheral surface of the following auxiliary member 71, the following body 5 moving to the fuel exhausting ports 24 and 31 as the liquid fuel 4 is exhausted. Then, at least one of the inner peripheral surface of the container main body 2 and the outer peripheral surface of the following auxiliary member 71, which are faced to each other, is made to be uneven.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CASIO COMPUTER CO LTDJAPAN
MITSUBISHI PENCIL CO LTDTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujisawa, Kiyoshi Fujioka, JP 16 57
Kabasawa, Yasunari Hanno, JP 30 137
Kamitani, Toshimi Fujioka, JP 28 93
Matsuda, Yugo Ome, JP 13 104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00