Arrangement for producing fluid flows and/or particle flows, and a method for the manufacture and operation thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8444837
APP PUB NO 20090008255A1
SERIAL NO

12278254

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for producing at least one of fluid flows and particles flows includes a substrate having a substrate surface. The substrate surface includes a matrix including a plurality of regions having at least one of a different magnitude of a surface charge, a different sign of the surface charge, and a different height above the substrate. A fluid including at least partially electrically charged particles is disposed at the substrate surface. A first control element is configured to supply a plurality of electrical voltages to a plurality of electrode pairs. The electric field exerts a first force on a component of the fluid within an electrical double layer. The component is disposed adjacent to the substrate surface. The electric field exerts a second force within the double layer and outside the double layer, the second force is exerted on the at least partially electrically charged particles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORSCHUNGSZENTRUM KARLSRUHE GMBH76133 KARLSRUHE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barz, Dominik Mannheim, DE 3 1
Class, Andreas Linkenheim-Hochstetten, DE 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00