Optical component manufacturing method, and lens, lens unit and camera module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8456742
APP PUB NO 20110176217A1
SERIAL NO

13121283

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is an optical component manufacturing method wherein various types of information, including information relating to each optical component, can be relatively easily printed on each optical component, even in the case where a plurality of optical components are manufactured in a batch. A lens, a lens unit and a camera module manufactured by using such method are also provided. Prior to dividing camera modules into individual camera modules, a pattern to be printed on each camera module, i.e., printing contents determined based on information on a first lens array or the like after formation, is printed on the surface of the first lens array at one time. Thus, information specific to each camera module can be printed even by the relatively simple method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KONICA MINOLTA OPTO INCHACHIOJI-SHI TOKYO 192-8505

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Yuiti Hino, JP 11 61
Mori, Hajime Tokyo, JP 74 916
Naito, Atsushi Sagamihara, JP 30 153
Tominami, Tohru Machida, JP 4 23
Wada, Kazuhiro Hachioji, JP 37 209

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00