Purification of materials non-electrically conductive in the solid state and electrically conductive in the molten state with electric induction power

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8460629
APP PUB NO 20100135889A1
SERIAL NO

12626194

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is apparatus for, and method of, heating, melting and purifying a material by electric induction heating in a susceptor furnace. Non-electrically conductive solid charge may initially be placed in the furnace. Output frequency from a power source supplying current to one or more induction coils surrounding the furnace is selected to maximize magnetic coupling with the susceptor material in the susceptor furnace to induce eddy current heating in the material. Heat transfers by conduction from the susceptor material to the non-electrically conductive charge placed in the susceptor furnace to melt the charge. Output frequency is reduced as the charge melts and becomes electrically conductive to enhance magnetic coupling with the melt in the furnace. Degassing of impurities from the melt can be achieved by bubbling a gas through the melt while the surface level of the melt is maintained at vacuum. Degassing is enhanced by creating an electromagnetic ripple/wave action that increases the surface area of the melt during the degassing process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INDUCTOTHERM CORP10 INDEL AVENUE PO BOX 157 RANCOCAS NJ 08073

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fishman, Oleg S Maple Glen, US 79 834
Mortimer, John H Little Egg Harbor Township, US 43 416

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00