Compound semiconductor lamination, method for manufacturing the same, and semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8461026
APP PUB NO 20100090249A1
SERIAL NO

12532377

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a compound semiconductor lamination that enables an InSb film to be formed on an Si substrate and enables development of applications to magnetic sensors, such as Hall elements, magneto-resistance elements, etc., optical devices, such as infrared sensors, etc., and electronic devices, such as transistors, etc., to be provided industrially, and a method for manufacturing the compound semiconductor lamination. An active layer, which is a compound semiconductor that does not contain As, is directly formed on an Si substrate. As is present at an interface of the active layer and a single crystal layer of the Si substrate. The compound semiconductor contains at least nitrogen. The compound semiconductor is a single crystal thin film. The Si substrate is a bulk single crystal substrate or a thin film substrate with an uppermost layer being Si.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ASAHI KASEI EMD CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyahara, Masatoshi Tokyo, JP 4 2
Shibata, Yoshihiko Tokyo, JP 21 460

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00