Compression of generated optical continuum utilizing higher-order-mode fiber

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8478134
APP PUB NO 20110052197A1
SERIAL NO

12584096

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An arrangement for providing pulse compression at the output of an optical continuum source (advantageously used in spectral slicing applications) includes a section of higher-order mode (HOM) fiber configured to exhibit a predetermined dispersion in at least a portion of the predetermined wavelength range and an effective area greater than 40 μm2, the dispersion of the HOM fiber selected to compensate for the dispersion introduced by the optical continuum source. The HOM fiber generates a compressed pulse output therefrom. An input mode converter is used to convert the created continuum from the fundamental mode associated with the conventional continuum sources to the higher-order mode(s) supported by the HOM fiber used to perform pulse compression. A bandpass filter is used to limit the bandwidth of the continuum signal to that associated with both the efficient conversion range of the mode converter and desired dispersion characteristic of the HOM fiber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OFS FITEL, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nicholson, Jeffrey W Morristown, US 43 613
Ramachandran, Siddharth Boston, US 47 461

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00