Method of providing a hold-down force upon a nuclear fuel assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8483348
APP PUB NO 20130003910A1
SERIAL NO

13527788

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hold-down spring unit for a top nozzle of a nuclear fuel assembly. The hold-down spring unit is coupled to the upper end of the top nozzle of the nuclear fuel assembly. The hold-down spring unit includes a first spring which provides a hold-down force upon the nuclear fuel assembly under start-up conditions or hot full power conditions of a nuclear reactor, and a second spring which provides an additional hold-down force upon the nuclear fuel assembly under start-up conditions of the nuclear reactor. The hold-down margin under start-up conditions or hot full power conditions is reduced, thus enhancing the mechanical and structural stability of the nuclear fuel assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA NUCLEAR FUEL CO LTDP O BOX 14 YUSEONG-GU DAEJEON 305-600

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eom, Kyong Bo Daejon, KR 11 9
Gwon, Gi-Jun Daejon, KR 5 9
Ha, Dong Geun Daejon, KR 11 9
Jeon, Kyeong Lak Daejon, KR 6 10
Kim, Jin Sun Daejon, KR 31 126
Kim, Kyoung Joo Daejon, KR 19 38
Lee, Jin Seok Daejon, KR 72 628
Park, Joon Kyoo Daejon, KR 7 9
Park, Nam Gyu Daejon, KR 17 50
Suh, Jung Min Daejon, KR 9 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00