Process of production and production system of high strength galvannealed steel sheet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8491734
APP PUB NO 20070051438A1
SERIAL NO

10568997

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process of production for producing a high strength galvannealed steel sheet by a hot-dip galvanized steel sheet production equipment using an all radiant tube type annealing furnace and a production equipment for the same are provided, comprising continuously hot-dip galvanizing a high strength steel sheet having a content of Si of 0.4 to 2.0 wt % during which making the atmosphere of the reducing zone an atmosphere containing H2 to 1 to 60 wt % and comprised of the balance of N2, H2O, O2, CO2, CO, and unavoidable impurities, controlling the log (PCO2/PH2) of the carbon dioxide partial pressure and hydrogen partial pressure in the atmosphere to log (PCO2/PH2)≦−0.5 and the log (PH2O/PH2) of the water partial pressure and hydrogen partial pressure to log (PH2O/PH2)≦−0.5, and controlling the log (PT/PH2) of the total partial pressure PT of the carbon dioxide partial pressure PCO2 and water partial pressure PH2O and the hydrogen partial pressure to −3≦log (PT/PH2)≦−0.5.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO 100-8071

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Honda, Kazuhiko Kimitsu, JP 47 635
Tanaka, Koki Futtsu, JP 60 795

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00