Protected solder ball joints in wafer level chip-scale packaging

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8492263
SERIAL NO

11941429

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Protection of a solder ball joint is disclosed in which the solder ball joint is located below the surface level of the encapsulating buffer layer. The buffering layer is etched to expose one or more electrode posts, each of which may be made up of a single column or multiple columns. A top layer resulting either from a top conductive cap or a plating layer around the electrode posts also lies below the buffer layer. When the solder ball is placed onto the posts, the solder/ball joint is protected in a position below the surface of the buffer layer, while still maintaining an electrical connection between the various solder balls and their associated or capping/plating material, electrode posts, wiring layers, and circuit layers. Therefore, the entire ball joint is protected from direct stress.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Kuo-Chin Hsin Chu, TW 46 446
Kiang, Bill Hsin chu, TW 6 204
Lee, Chien-Hsiun Hsin Chu, TW 50 1125
Lin, Chung-Yi Hsin chu, TW 48 625
Tsao, Pei-Haw Tai-Chung, TW 110 1245
Wang, Chung Yu Hsin Chu, TW 35 901

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00