Device and method for explosive forming

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8516866
APP PUB NO 20120024029A1
SERIAL NO

13251475

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for explosive forming of a tubular work piece includes a multipart explosive forming die, which defines a forming area having an inner surface corresponding to a final shape of the tubular work piece and a nozzle arrangement disposed adjacent to the forming area. The device also includes a plug for forming a seal by simultaneously deforming an end of the work piece and clamping the deformed end between the plug and a facing surface of the nozzle arrangement. In this way, the work piece itself contributes to the sealing of an internal explosion space. With insertion of new work piece blanks, and introduction of the plug during each individual forming process, new seals are produced in a convenient manner during subsequent forming processes. The device supports a simplified handling approach and integrates several functions into one working step, resulting in a shorter cycle times and cost-effective industrial production.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COSMA ENGINEERING EUROPE AGMAGNASTRASSE 1 OBERWALTERSDORF A-2522

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Stranz, Andreas Osterreich, AT 15 20
Trubert, Franz Vienna, AT 6 18
Zak, Alexander Osterreich, AT 42 307

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00