Impact energy management method and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8528119
APP PUB NO 20120266366A1
SERIAL NO

13534160

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An impact-absorbing protective structure comprises one or more compressible cells. Each cell is in the form of a thin-walled plastic enclosure defining an inner, fluid-filled chamber with at least one small orifice through which fluid resistively flows. Each cell includes an initially resistive mechanism that resists collapse during an initial phase of an impact and that then yields to allow the remainder of the impact to be managed by the venting of fluid through the orifice. The initially resistive mechanism may be implemented by providing the cell with semi-vertical side walls of an appropriate thickness or by combining a resiliently collapsible ring with the cell. After the initially resistive mechanism yields to the impact, the remainder of the impact is managed by the fluid venting through the orifice. The cell properties can be readily engineered to optimize the impact-absorbing response of the cell to a wide range of impact energies.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RIDDELL INC1700 W HIGGINS ROAD SUITE 500 DES PLAINES IL 60018

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ferrara, Vincent Wellesley, US 4 92

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00