Compressor having capacity modulation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8529232
APP PUB NO 20110033328A1
SERIAL NO

12909303

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A compressor includes first and second scroll members, a structure supporting the second scroll member, and a first piston. The first scroll member includes a first end plate and a first spiral wrap. The second scroll member includes a second end plate and a second spiral wrap engaged with the first spiral wrap to form compression pockets. The second end plate includes a first aperture in communication with a first compression pocket. The structure includes a first recess and first and second passages. The first piston is axially displaceable between first and second positions within the first recess. The first piston isolates the first passage from communication with the second passage when in the first and second positions, prevents communication between the first aperture and the first passage when in the first position, and provides communication between the first aperture and the first passage when in the second position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EMERSON CLIMATE TECHNOLOGIES INC1675 W CAMPBELL ROAD SIDNEY OH 45365

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akei, Masao Miamisburg, US 43 1500
Perevozchikov, Michael M Tipp City, US 88 1366
Stover, Robert C Versailles, US 63 1842

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00