Manufacturing method of metal oxide semiconductor material for gas sensor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8529799
APP PUB NO 20120112137A1
SERIAL NO

13060886

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a manufacturing method of a metal oxide semiconductor material for gas sensors by which an oxide precursor and noble metal colloid particles will not readily cohere in the manufacturing process. The manufacturing process implements a precursor solution synthesis step 1 of synthesizing an oxide precursor solution in which an oxide precursor is dispersed, a pH adjustment step 3 of adjusting the pH of the oxide precursor solution, a precursor-colloid dispersion preparation step 5 of preparing an oxide precursor-noble metal colloid dispersion in which the oxide precursor and the noble metal colloid are dispersed substantially uniformly, a purifying step 7 of purifying the oxide precursor-noble metal colloid dispersion to obtain a purified oxide precursor noble metal colloid dispersion, and a freeze-drying step 11 of freeze-drying an precipitate of the purified oxide precursor-noble metal colloid dispersion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOKURIKU ELECTRIC INDUSTRY CO LTD3158 SHIMO-OKUBO OSAWANO-MACHI KAMI-NIIKAWAGUN TOYAMA PREF

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imamura, Tetsuji Toyama, JP 5 6
Ishibashi, Takahiro Toyama, JP 16 205
Kuwahara, Daisuke Toyama, JP 3 5
Nakano, Takayuki Toyama, JP 79 597

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00