Pre-operative planning and manufacturing method for orthopedic procedure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8532807
SERIAL NO

13153760

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pre-operative planning and manufacturing method for orthopedic surgery includes obtaining pre-operative medical image data representing a joint portion of a patient. The method also includes constructing a three-dimensional digital model of the joint portion and manufacturing a patient-specific alignment guide for the joint portion from the three-dimensional digital model of the joint portion when the image data is sufficient to construct the three-dimensional digital model of the joint portion. The patient-specific alignment guide has a three-dimensional patient-specific surface pre-operatively configured to nest and closely conform to a corresponding surface of the joint portion of the patient in only one position relative to the joint portion. The method further includes determining, from the image data, a size of a non-custom implant to be implanted in the patient and manufacturing the non-custom implant when there is insufficient image data to construct the patient-specific alignment guide therefrom.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BIOMET MANUFACTURING, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Metzger, Robert Wakarusa, US 204 26414

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00