Multi-stable actuation apparatus and methods for making and using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8540206
APP PUB NO 20100108922A1
SERIAL NO

12539521

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Actuator apparatus having a multi-stable element actuated by memory alloy actuating elements. In one embodiment, the multi-stable actuator comprises a bistable (two-state) diaphragm element adapted to alternate between two stable configurations via forces exerted on the diaphragm by more than one memory alloy filaments in response to thermal activation. In another embodiment, the bistable diaphragm of the multi-stable actuator transitions from a first to a second stable configuration via forces exerted by a single filament in response to direct or indirect thermal activation. A portion of the assembly is displaced when the assembly is in the second configuration. The bistable diaphragm transitions back to the first stable configuration via application of mechanical force on a portion of the assembly which was displaced. Methods for making and using the bistable actuator apparatus are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AUTOSPLICE INC10121 BARNES CANYON ROAD SAN DIEGO CA 92121

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bogursky, Robert Encinitas, US 13 331
Foshansky, Leonid San Diego, US 15 255

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00