Operating microscope and method for pivoting a co-observer microscope

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8547633
APP PUB NO 20110032607A1
SERIAL NO

12851183

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An operating microscope has a main objective (1) that extends along an objective plane and is penetrated by a binocular main observer beam path and a binocular co-observer beam path. The binocular main observer beam path has two main observation pupils (3a, 3b) in the objective plane with centers on a first straight line (7). The binocular co-observer beam path has two co-observation pupils (5a, 5b) in the objective plane with centers on a second straight line (9). The first and second straight lines (7, 9) intersect. The co-observer beam path can be displaced with respect to the main observer beam path so that the angle between the second and first straight line (9, 7) changes. The center point (6) between the co-observation pupils (5a, 5b) in the objective plane displaces when there is a change in the angle between the second and first imagined straight lines (9, 7).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CARL ZEISS MEDITEC AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abele, Alfons Schwaebisch Gmuend, DE 22 495
Demleitner, Rupert Heidenheim, DE 4 20
Kolster, Daniel Oberkochen, DE 21 114

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00