Method for producing continuous expanded polystyrene foam parts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8551374
APP PUB NO 20100244299A1
SERIAL NO

12439661

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a novel, innovative industrial method for producing polystyrene (EPS) foam parts of arbitrary length and having a constant cross-section, with mixed densities located in accordance with the mechanical and thermal properties required for each application. The invention also relates to a machine (apparatus) for producing said solid parts having localized densities defined by the mechanical and thermal requirements of the application. The aforementioned products are produced by joined both longitudinally and transversely. The invention can be used to reduce the standard method to three steps, thereby resulting in a significant saving in terms of production. Moreover, unlike with the standard method, variants can be produced using the above-mentioned method, thereby increasing the range of application said type of products.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSIDAD DE GUANAJUATOLASCURAIN DE RETANA NO 5 ZONA CENTRO GUANAJUATO GUANAJUATO 36000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aguilera, Cortés Luz Antonio Guanajuato, MX 1 0
Plascencia, Mora Héctor Guanajuato, MX 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00