Process for production of nickel and cobalt using metal hydroxide, metal oxide and/or metal carbonate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8557019
APP PUB NO 20090249921A1
SERIAL NO

12424250

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing metal oxide from a metal salt selected from nickel hydroxide, cobalt hydroxide, mixed nickel-cobalt hydroxide, nickel carbonate, cobalt carbonate or mixed nickel-cobalt carbonate includes providing a mixture of the metal salt, mixing the metal salt with a binder selected from an inorganic binder or an organic binder, forming the mixture into agglomerates, and calcining the agglomerates to produce metal oxide. Another method for making metallic nickel or cobalt includes providing the above metal salt, mixing the metal salt with the above binder to form a mixture, optionally adding water, forming the mixture into agglomerates, drying the agglomerates, adding an effective reducing amount of coke and/or coal and directly reducing the dried agglomerates with an effective amount of heat to produce metallic nickel and/or cobalt. Coke particles may be added to the mixture prior to agglomeration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VALE CANADA LIMITEDTORONTO ON M5J 2K2

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baczkowska, Wanda Agnieszka Etobicoke, CA 1 1
Marcuson, Samuel Walton Mississauga, CA 6 14
Osborne, Geoffrey Edwin Stoney Creek, CA 4 14
Tackie, Emmanuel Nii Mississauga, CA 1 1
Vahed, Ahmed Oakville, CA 6 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00