Systems and methods for independently controlling the operation of fuel cell stacks and fuel cell systems incorporating the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8617754
APP PUB NO 20120088171A1
SERIAL NO

13316245

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure is directed to systems and methods for independently controlling the operation of fuel cell stacks and to fuel cell systems incorporating the same. These systems and methods may include providing a fuel cell system including a plurality of fuel cell stacks and at least a first energy storage device and controlling the operation of the plurality of fuel cell stacks based at least in part on a variable associated with the fuel cell system and/or an energy consuming device. These systems and methods may further include beginning production of electrical output from the fuel cell system responsive to a start condition, initiating production of electrical output from the plurality of fuel cell stacks responsive to a plurality of stack start conditions, and ceasing the production of electrical output from the fuel cell stacks responsive to at least a first stack stop condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DCNS SA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Edmiston, Thane Rea Bend, US 1 6
Greenough, Benjamin Charles Bend, US 2 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00