Mg-Ti-Al composite metal hydroxide having a laminated structure, and a production method therefore

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8623320
APP PUB NO 20130126780A1
SERIAL NO

13646291

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a novel Mg—Ti—Al composite metal hydroxide and to production method therefor. Mg—Ti—Al composite hydroxide particles can be obtained by subjecting a solution containing a magnesium salt and a titanium salt to ultrasound processing and carrying out a high-temperature and high-pressure reaction with a solution containing an aluminum salt in the proportions of the metal elements comprised in the Mg—Ti—Al composite metal hydroxide, thereby giving the advantageous effects that the halogen capturing ability is excellent and, when used in a polymer, degradation and early-staining prevention properties and transparency are outstanding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIN WON CHEMICAL CO LTDSIHWA INDUSTRIAL COMPLEX I LA #106 1236-5 JEONGWANGDONG SIHEUNG-SI GYEONGGI-DO 429-914
SHIN WON INDUSTRIAL CO LTD1203-4 WONJEONG-RI POSEUNG-EUP PYEONGTAEK-SI GYEONGGI-DO 451-764

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Hee Soo Gyeonggi-do, KR 100 590
Kim, Sung Yeon Gyeonggi-do, KR 22 39
Lee, Kwang Hee Gyeonggi-do, KR 202 1604
Song, Seok Keun Gyeonggi-do, KR 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00