Multiple core network device with core redundancy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8630287
APP PUB NO 20120044948A1
SERIAL NO

13214820

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment of a network device includes a plurality of switch cores and a plurality of ports for receiving and transmitting data frames on a network disposed on a single integrated circuit, where switch core is coupled to a subset of the plurality of ports. The network device includes a deactivator configured to selectively deactivate at least a portion of one or more switch cores among the plurality of switch cores on the single integrated circuit, and the network device is configured to forward data frames among the plurality of ports based on a configuration of active portions of the plurality of switch cores. The deactivated portions may include ingress processing pipelines, egress processing pipelines, and/or entire switch cores. The portions of the switch cores to be deactivated may be dynamically be determined based on connectors of the integrated circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARVELL ISRAEL (M I S L) LTD6 HAMADA STREET MORDOT HACARMEL INDUSTRIAL PARK YOKNEAM 20692

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Avivi, Amit Tel Mond, IL 13 81
Nachum, Youval Holon, IL 24 360
Sivan, Ehud Zichron Ya'Akov, IL 13 117

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00