Process for producing chlorine with low bromine content

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8636893
APP PUB NO 20120186990A1
SERIAL NO

13286242

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Chlorine with a low bromine content is produced by electrolyzing brine to produce gaseous chlorine, alkali metal hydroxide and hydrogen, separating the gaseous chlorine from the electrolyte (anolyte in the case of the membrane process), directing electrolyte (anolyte in the case of the membrane process) to a primary dechlorination step using hydrochloric acid to remove gaseous chlorine therefrom, optionally directing depleted electrolyte (anolyte in the case of the membrane process) from the primary dechlorination step to a secondary dechlorination step using a reducing agent for chlorine and oxychlorine species, and recycling dechlorinated depleted electrolyte (anolyte in the case of the membrane process) to salt dissolvers to prepare brine for electrolysis. At least part of the gaseous chlorine generated in the primary dechlorination step is not combined with gaseous chlorine generated in the electrolysis step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ERCO WORLDWIDE LP242 HARGRAVE STREET WINNIPEG R3C 0V1

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dluzniewski, Tomasz Jerzy Mississauga, CA 2 0
Lipsztajn, Marek Etobicoke, CA 25 275
Omelchenko, Yuri Alexeevich Toronto, CA 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00