Cyclic preparation method for producing titanium boride from intermediate feedstock potassium-based titanium-boron-fluorine salt mixture and producing potassium cryolite as byproduct

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8641996
APP PUB NO 20130095021A1
SERIAL NO

13709023

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cyclic preparation method including the following steps: a) boric acid or boric anhydride is added with hydrofluoric acid and then with potassium sulfate for reaction to generate potassium fluoborate; titanium-iron concentrate is added with hydrofluoric acid and then with potassium sulfate for reaction to generate potassium fluotitanate; B) the potassium fluoborate is mixed with the potassium fluotitanate, and the mixture reacts with aluminum to generate titanium boride and potassium cryolite; C) the potassium cryolite is sucked out and then fed into a rotary reaction kettle together with concentrated sulfuric acid, hydrogen fluoride gas as well as potassium sulfate and potassium aluminum sulfate are generated by reaction in the rotary reaction kettle, and the hydrogen fluoride gas is collected and then dissolved in water to obtain hydrofluoric acid aqueous solution; and D) the obtained hydrofluoric acid aqueous solution and potassium sulfate aqueous solution are recycled.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN SUNXING LIGHT ALLOYS MATERIALS CO LTD518107 GUANGMING NEW DISTRICT HI TECH INDUSTRIAL PARK XINXING DISTRICT GUANGDONG SHENZHEN SHENZHEN CITY GUANGDONG PROVINCE 518107

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Xuemin Guangdong, CN 418 7174
Yang, Jun Guanguang, CN 792 8454
Ye, Qingdong Guangdong, CN 25 29
Yu, Yueming Guangdong, CN 25 28
Zhou, Zhi Guangdong, CN 142 2239

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00