Process of manufacturing crystalline silicon solar cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8647895
APP PUB NO 20140038339A1
SERIAL NO

13567361

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process of manufacturing a crystalline silicon solar cell includes forming a rough surface on a surface of the crystalline silicon wafer and an Al2O3 film is coated on a non-rough surface thereof. A single-sided n diffusion layer and phosphosilicate glass film are formed. An anti-reflection layer SiNx film is formed on a top surface of the phosphosilicate glass film. An Al metallic film is formed as a back ohmic electrode on the Al2O3 film. The local area of the anti-reflection layer SiNx film and the phosphosilicate glass film is melted and removed to form a local area of n+-Si layer. Then, an Al—Si back ohmic contact electrode is formed between the Al metallic film and the crystalline silicon wafer. A front ohmic contact electrode is formed on the molten and removed area of the antireflection layer SiNx film and the phosphosilicate film by light-induced plating.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ATOMIC ENERGY COUNCIL - INSTITUTE OF NUCLEAR RESEARCHNO 1000 WUNHUA RD LONGTAN TOWNSHIP TAOYUAN COUNTY 325

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yang, Tsun-Neng Taipei, TW 48 125

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00