Control device for internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8649957
APP PUB NO 20130297186A1
SERIAL NO

13520502

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device is provided that generates a target air-fuel ratio by lessening a change speed of a required air-fuel ratio of an internal combustion engine. However, when a deterioration degree of a catalyst which is disposed in an exhaust passage of the internal combustion engine is a predetermined reference or more, lessening of the change speed of the required air-fuel ratio is stopped, or a lessening degree of the change speed of the required air-fuel ratio is decreased. The control device calculates a target air quantity for realizing the required torque under the target air-fuel ratio. For calculation of the target air quantity, data in which relationship of torque generated by the internal combustion engine and an air quantity taken into a cylinder is fixed by being related to an air-fuel ratio can be used.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawakami, Hajime Susono, JP 45 568
Okazaki, Shuntaro Gotemba, JP 82 360
Shibayama, Masashi Sunto-gun, JP 12 28
Shokatsu, Kaoru Susono, JP 6 11
Yoshizaki, Satoshi Sunto-gun, JP 61 163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00