Lift-control device for a poppet valve of an internal-combustion engine or operating machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8651073
APP PUB NO 20100095918A1
SERIAL NO

12375355

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lift-control device for a poppet valve of an internal-combustion engine including a first valve-lift means, a second valve-lift means, and a means for selective de-activation of the second valve-lift means. In an embodiment, the first valve-lift means is configured to define a first valve-lift law and is operatively connected with a rocker that acts on a stem of said valve to move said stem according to the first valve-lift law; and the second valve-lift means is configured to define a second valve-lift law and is operatively connected with the rocker. In an embodiment, the first valve-lift means comprises a profile of a cam or eccentric acting on the rocker to cause it to oscillate about a first axis so as to move the valve stem according to the first valve-lift law; and the second valve-lift means comprises an auxiliary rocker that co-operates in contact with the first valve-lift means.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITED4 DUBLIN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cecur, Majo Rivarolo Canavese, IT 56 651

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00