Method and devices for regulating the flow rate and for slowing down melt streams through magnetic fields in the tapping of metallurgical containers such as blast furnaces and melt furnaces

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8658084
APP PUB NO 20110175265A1
SERIAL NO

13057951

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for regulating the flow rate and for slowing down melt streams through magnetic fields in the tapping of metallurgical containers such as blast furnaces and melt furnaces. The method is characterized in that the melt stream is routed in a closed routing element using at least two magnetic fields disposed in series one after the other in the flow direction of the melt, said magnetic fields having a constant polarity opposite to one another, in such a way that the magnetic field lines transversally penetrate the melt flow across the entire cross section thereof and such that opposite voltages are induced in the melt stream by the magnetic fields, there being at least three eddy current fields produced thereby in the melt stream that are disposed axially one after the other, and that due to the interactions between the magnetic fields and the eddy currents forces are generated that can be used to reduce the flow rate of the melt stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TMT TAPPING-MEASURING-TECHNOLOGY GMBH57072 SIEGEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morgenstern, Hans-Uwe Freudenberg, DE 6 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00