Multiple return-to-zero current switching digital-to-analog converter for RF signal generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8659458
SERIAL NO

13649553

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A “multiple return-to-zero” (MRZ) current switching DAC. In operation, the outputs of respective current sources are selectively directed to respective intermediate nodes in response to respective control signals which vary with a digital input word, and in synchronization with a clock CK1. A plurality of MRZ current switches are connected between respective intermediate nodes and the DAC's analog output. The MRZ switches are driven with a clock CK2 which toggles in synchronization with CK1 at a frequency fCK2=N*fCK1. The MRZ switches are operated such that switching noise that arises when CK1 is asserted is prevented from appearing on the analog output. When properly arranged, the DAC can generate a direct digital waveform at RF frequencies, with N chosen to produce an output spectrum such that the DAC's output power is relatively high within the desired frequency range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TELEDYNE SCIENTIFIC & IMAGING, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choe, Myung-Jun Thousand Oaks, US 7 87
Lee, Kang-Jin Thousand Oaks, US 16 211
Seo, Munkyo Thousand Oaks, US 2 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00