Fuel cell system with partial external reforming and direct internal reforming

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8663851
APP PUB NO 20130288145A1
SERIAL NO

13848408

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell system includes a plurality of solid oxide fuel cells arranged in a fuel cell stack, an integrated heat exchanger/reformer operable to partially reform an anode feed prior to entry into the fuel cell stack, an anode tailgas oxidizer, and an offgas flow path extending away from an anode side of the fuel cell stack and having a first branch to selectively combine offgas from the anode side of the fuel cell stack with fuel from a fuel source to comprise the anode feed to the fuel cell stack and a second branch to supply offgas from the anode side of the fuel cell stack to the anode tailgas oxidizer. The integrated heat exchanger/reformer transfers heat from the oxidized offgas from the anode tailgas oxidizer to the anode feed before the anode feed enters the anode side of the fuel cell stack. The offgas from the anode tailgas oxidizer provides the sole heat source for the anode feed traveling through the integrated heat exchanger/reformer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MODINE MANUFACTURING COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Valensa, Jeroen Muskego, US 40 712

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00