Efficient construction of synthetic backups within deduplication storage system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8682873
SERIAL NO

12958205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A deduplication storage system enables new input data to be deduplicated with data of synthetic backups already constructed, and for this purpose efficiently calculates deduplication digests for synthetic backups being constructed, based on already existing digests of data referenced by the synthetic backups. For each input data segment of the plurality of input data segments of a synthetic backup being constructed, a plurality of deduplication digests of stored data segments, referenced by the input data segment, is retrieved from an index. Each input data segment is partitioned into each of a plurality of fixed-sized data sub-segments. A calculation is performed producing a deduplication digest for a data sub-segment, where the calculation is based on the retrieved deduplication digests of the plurality of stored data sub-segments referenced by the input data sub-segment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aronovich, Lior Toronto, CA 182 1612
Hirsch, Michael Mazkeret Batya, IL 104 2925
Toaff, Yair Givat Shmuel, IL 53 265

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00