Process for manufacturing a laminated glazing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8683871
APP PUB NO 20110200831A1
SERIAL NO

13120311

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for manufacturing a laminated glazing, in which a lamination interlayer is interposed between two substrates having a glass function, including: making a measurement of Young's modulus E on a sample of the interlayer, using a viscoanalyzer, by varying temperature and frequency while imposing a constant dynamic displacement; making a numerical treatment of curves obtained, using WLF (Williams-Landel-Ferry) equations, to establish a law E(f) governing behavior of a material constituting the interlayer sample at a given temperature; producing a numerical model based on a finite-element method in bending of a laminated glazing panel, wherein mechanical properties of the sample result from the preceding operations; comparing results of the numerical calculation with those obtained with analytical formulae in which participation of the interlayer in transferring shear in the laminated glazing is represented by a transfer coefficient ω; varying the transfer coefficient ω in the analytical formulae until results converge; and constructing a transfer function ω=f(E) by successive iterations.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAINT-GOBAIN GLASS FRANCE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Decourcelle, Romain Compiegne, FR 13 119
Levasseur, Fabien Longueil-Annel, FR 8 114
Nugue, Jean-Clement Lamorlaye, FR 11 357

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00