Multiple tool attachment system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8684292
APP PUB NO 20130306771A1
SERIAL NO

13867524

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multiple tool attachment system is adapted to be attached to demolition equipment. The system includes a universal body attached to the demolition equipment. A series of tools is independently attachable to the universal body. The universal body includes a guide slot extending longitudinally along the universal body. Each tool generally includes a pair of pivotable jaws adapted to be pivotably attached to the universal body with at least one linkage extending from the universal body and attachable to each jaw of the tool. A slide member is received within the guide slot, with each linkage attached to the slide member, and a piston cylinder arrangement is attached to the universal body and coupled to the slide member for moving the slide member and the jaws. The multiple tool attachment system is provided with quick change features and is designed to optimize the cutting characteristics throughout the movement cycle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RAMUN JOHN RPOLAND OH 44514

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ramun, John R Poland, US 40 532

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00