Process for preparing ethylene and/or propylene and a butadiene-enriched product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8686211
SERIAL NO

13606348

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a process for preparing ethylene and propylene and a butadiene-enriched product, comprising the steps of:

    a) providing a C4 hydrocarbon stream, comprising iso-olefins and butadiene.b) subjecting the C4 hydrocarbon stream to an etherification process, wherein the iso-olefins are converted with methanol and/or ethanol to an tert-alkyl ether in the presence of a catalyst, wherein the molar ratio of alcohol to iso-olefin is maintained above 1, and retrieving an etherification product stream;c) separating the etherification product stream into an ether-enriched stream and a butadiene-enriched product;d) converting the tert-alkyl ether in the ether-enriched stream to ethylene and/or propylene by contacting least part of the ether-enriched stream with a molecular sieve-comprising catalyst at a temperature in the range of from 350 to 1000° C. and retrieving an olefinic product comprising ethylene and/or propylene.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHELL OIL COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Van, Westrenen Jeroen Amsterdam, NL 106 359

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00