Space frame connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8739492
APP PUB NO 20100005752A1
SERIAL NO

12500467

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A space frame connector is provided for attaching an oblique strut tube to an axial chord of a space frame. The space frame connector includes a collar adapted to fit over an axial chord. The collar is equipped with one or more attachment flanges. The space frame connector also includes a strut tube having an extrusion flange formed in at least one of its ends. The extrusion flange is made up of two parallel leaves that define a slot between them. The slot is sized and shaped to fit over an attachment flange on the collar that is positioned over the axial chord. The extrusion flange can be formed using simple press and punch tools. Space frames used to support solar energy collector arrays can be assembled in the field, including formation of the extrusion flanges on the oblique strut tubes, or multiple strut tubes can be attached to axial chords and compactly packed and transported to the field for use in constructing space frames, for example for supporting large parabolic trough solar collectors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SKYFUEL INC18300 WEST HIGHWAY 72 ARVADA CO 80007

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Farr, Adrian L Conifer, US 3 50
Gee, Randall C Arvada, US 8 200
Hawkins, Robert Littleton, US 36 393

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 3, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00