Titanium oxide sol and process for producing same, ultrafine particulate titanium oxide, process for producing same, and uses of same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8741431
APP PUB NO 20130004771A1
SERIAL NO

13583860

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A liquid phase method for producing titanium oxide sol by hydrolysis of titanium tetrachloride, which includes mixing an aqueous titanium tetrachloride solution into water at a temperature of 80° C. or higher within 60 seconds while maintaining the mixed solution at the temperature and cooling it to less than 60° C. within 15 minutes after the mixing is completed. Also disclosed is a titanium oxide sol obtained by the method, having an average primal particle diameter (DBET) of 3 to 8 nm, a cumulative 50% volume particle diameter (D50DLS) and DBET have the relationship represented by D50DLS=k×DBET where k is 1 or more and less than 5, and an anatase content of 70% or more; a particulate titanium oxide obtained by drying the titanium oxide sol; and a production method and application thereof to solar cells, lithium ion battery electrodes and dielectric materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHOWA DENKO K.K.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kayama, Susumu Toyama, JP 13 72
Mizue, Kei Toyama, JP 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 3, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00