Photo-coupler device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8742431
APP PUB NO 20140001492A1
SERIAL NO

13734318

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A photo-coupler device includes a P-type substrate, a P-type epitaxial layer, an insulation layer, a plurality of shielding layers, a metal layer and a passivation layer. The P-type epitaxial layer is deposited on the P-type substrate and includes two conducting regions and a plurality of N+ electrode regions between the two conducting regions. The insulation layer is deposited on the P-type epitaxial layer. The shielding layers comprising first shielding layers and second shielding layers are deposited in the insulation layer in parallel in a horizontal direction, and the first shielding layers are arranged for correspondingly covering the two conducting regions, the second shielding layers are arranged for correspondingly covering the at least one of the N+ electrode regions. The metal layer is made of Ag and is deposited on the insulation layer. The passivation layer is deposited on the metal layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VISHAY CAPELLA MICROSYSTEMS (TAIWAN) LIMITED6F NO 43 FUSING RD SINDIAN DIST NEW TAIPEI CITY 231-50

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Yuh-Min San Ramon, US 29 90
Shih, Cheng-Chung New Taipei, TW 30 654
Tsang, Koon-Wing Fremont, US 13 128

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 3, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00