Method of manufacturing multilayer printed wiring board

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8756805
APP PUB NO 20120037409A1
SERIAL NO

13256114

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a multilayer board, including: forming a hole through a pre-preg by laser, filling the hole with conductive paste containing a resin component and metal powder, and arranging copper layer portions of patterned boards on and under the filled conductive paste and pressing the same, wherein in the conductive paste at least surface layers of the different metal powders are melted and alloyed, the pre-preg has a ratio A/B of at least 10 before being subjected to preheating, where A is a storage modulus at an inflection point where the storage modulus changes from increasing to decreasing and B is a storage modulus at an inflection point where the storage modulus changes from decreasing to increasing in a temperature rising from 60 to 200 degree C., and preheating the pre-preg before the drilling step to reduce the ratio A/B to below 10.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TATSUTA ELECTRIC WIRE & CABLE CO LTD3-1 IWATACHO 2-CHOME HIGASHIOSAKA-SHI OSAKA 5788585 ?5788585

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Umeda, Hiroaki Higashiosaka, JP 49 183
Yamaguchi, Norihiro Higashiosaka, JP 23 276
Yukawa, Ken Higashiosaka, JP 8 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 24, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00