Analyzing fluid within a context

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8762063
APP PUB NO 20130046473A1
SERIAL NO

13213195

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A processor accepts sensor data about a geological formation from a sensor. The sensor data is such that processing the sensor data using a processing technique to estimate a parameter of the geological formation without a constraint, whose value is not yet known, produces a plurality of non-unique estimates of the parameter. The processor accepts more than two time-displaced images of fluid sampled from the geological formation. The time displacements between the images are substantially defined by a mathematical series. The processor processes the images to determine the constraint. The processor processes the sensor data using the processing technique constrained by the constraint to estimate the parameter of the geological formation. The processor uses the estimated parameter to affect the drilling of a well through the geological formation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Atkinson, Robert S Richmond, US 7 24
Jones, Christopher M Houston, US 97 3691
Pelletier, Michael T Houston, US 190 2630
Zannoni, Stephen A Houston, US 4 99
Zhang, Wei Houston, US 2322 17837

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 24, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00