Composition for preparing separator, method for preparing separator, and electrochemical device having separator prepared therefrom

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8765023
APP PUB NO 20140011093A1
SERIAL NO

13930970

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a composition for preparing a separator for an electrochemical device, a method preparing a separator for an electrochemical device, and an electrochemical device having a separator prepared therefrom, more particularly, a composition for preparing a separator for an electrochemical device, comprising a polyolefin, a first diluent, and a second diluent, wherein an interaction energy between the first diluent and the second diluent is in the range of 2 to 3.5 cal/cm3, a method preparing a separator for an electrochemical device using the composition, and an electrochemical device having a separator prepared therefrom. In accordance with the present invention, the pore size of a polyolefin separator can be suitably controlled into a size desired by a user, and the high-temperature stability and mechanical property of the separator can be remarkably improved, thereby enhancing the life time and stability of an electrochemical device having the same.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG CHEM, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Bong-Tae Daejeon, KR 31 289
Park, Cheon-Il Daejeon, KR 9 29
Song, Heon-Sik Daejeon, KR 34 343

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 1, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00