Roll to roll evaporation tool for solar absorber precursor formation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8771419
APP PUB NO 20090092744A1
SERIAL NO

11868443

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An evaporation tool for forming a dopant structure on a front surface of a continuous workpiece, wherein the front surface includes a precursor layer to form Group IBIIIAVIA absorbers for solar cells and the dopant structure is used to introduce dopants into the precursor layer. The tool includes at least a first vapor source station to deposit a Group VIA material, such as Se, and a second vapor station to deposit a dopant material, such as Na, onto the continuous workpiece. A moving assembly of the tool holds and moves the continuous workpiece within the tool by feeding the continuous workpiece from a first end and taking up from a second end of the tool. A support assembly of the tool contacts a back surface of the continuous workpiece to remove the heat from and apply tension to the continuous workpiece during the process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SOLOPOWER SYSTEMS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Basol, Bulent M Manhattan Beach, US 242 5018
Pinarbasi, Mustafa Morgan Hill, US 193 3535

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 8, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00