Arrangement of components in a solid oxide fuel cell and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8771898
APP PUB NO 20110027693A1
SERIAL NO

12752700

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein are solid oxide fuel cells and manufacturing methods thereof. In certain aspects, the solid oxide fuel cells described herein include a plurality of anodes and a plurality of cathodes in which the anodes and cathodes are alternately stacked on each other and have non-overlapping sections in which the anodes and cathodes do not overlap partially. In certain aspects, the plurality of anodes are electrically connected to a first electrode, and the plurality of cathodes are electrically connected to a second electrode. In certain aspects, a solid electrolyte can be included, for example, between the anode and the cathode. In certain aspects, partitioning sections are disposed between each of the cathodes and the first electrode and between each of the anodes and the second electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TDK CORPORATION;TOHOKU UNIVERSITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hitomi, Atsushi Tokyo, JP 23 228
Sugiura, Kei Tokyo, JP 15 27
Takamura, Hitoshi Miyagi, JP 12 822
Urano, Takeshi Tokyo, JP 13 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 8, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00