Interconnect structure employing a Mn-group VIIIB alloy liner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8772942
APP PUB NO 20110180309A1
SERIAL NO

12693637

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metallic liner stack including at least a Group VIIIB element layer and a CuMn alloy layer is deposited within a trench in a dielectric layer. Copper is deposited on the metallic liner stack and planarized to form a conductive interconnect structure, which can be a metal line, a metal via, or a combination thereof. The deposited copper and the metallic liner stack are annealed before or after planarization. The Mn atoms are gettered by the Group VIIIB element layer to form a metallic alloy liner including Mn and at least one of Group VIIIB elements. Mn within the metallic alloy liner combines with oxygen during the anneal to form MnO, which acts as a strong barrier to oxygen diffusion, thereby enhancing the reliability of the conductive interconnect structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Edelstein, Daniel C Yorktown Heights, US 303 6461
Nogami, Takeshi Albany, US 235 4443
Tsumura, Kazumichi Guilderland, US 27 347
Usui, Takamasa Selkirk, US 85 1181

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 8, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00