Transmission shift fork

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8776631
APP PUB NO 20120011955A1
SERIAL NO

12968447

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transmission shift fork engages with a coupling sleeve of a synchronizer and shifting the coupling sleeve. The transmission shift fork includes a first part, second part, and at least one fin. The first part is arranged to movably mount the transmission shift fork in a shift fork movement direction. The second part includes a coupling sleeve facing surface, an outwardly facing surface, and a pair of shift-direction facing surfaces. The coupling sleeve facing surface includes at least one coupling sleeve engagement part arranged to engage with an engaging groove formed on an external circumferential surface of the coupling sleeve. The outwardly facing surface includes an oil catch disposed in a position with respect to the coupling sleeve engagement part such that the oil catch captures lubricating oil and supplies to the coupling sleeve engagement part. The fin projects from inside an oil receiving recess defined by the oil catch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN MOTOR CO LTDJAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hada, Masatoshi Nagoya, JP 36 272
Momota, Hiroyuki Mie, JP 1 8
Mori, Takao Kuwana, JP 64 1241
Nakamura, Kentarou Kasugai, JP 54 416
Oya, Hitoshi Nagoya, JP 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 15, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00