Process for the manufacture of a doped III-N bulk crystal and a free-standing III-N substrate, and doped III-N bulk crystal and free-standing III-N substrate as such

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8778078
APP PUB NO 20080083910A1
SERIAL NO

11835669

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing a doped III-N bulk crystal, wherein III denotes at least one element of the main group III of the periodic system, selected from Al, Ga and In, wherein the doped crystalline III-N layer or the doped III-N bulk crystal is deposited on a substrate or template in a reactor, and wherein the feeding of at least one dopant into the reactor is carried out in admixture with at least one group III material. In this manner, III-N bulk crystals and III-N single crystal substrates separated therefrom can be obtained with a very homogeneous distribution of dopants in the growth direction as well as in the growth plane perpendicular thereto, a very homogeneous distribution of charge carriers and/or of the specific electric resistivity in the growth direction as well as in the growth plane perpendicular thereto, and a very good crystal quality.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FREIBERGER COMPOUND MATERIALS GMBH09599 FREIBERG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brückner, Peter Tettnang, DE 6 290
Habel, Frank Freiberg, DE 27 813
Leibiger, Gunnar Freiberg, DE 13 60
Scholz, Ferdinand Ulm, DE 11 777

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 15, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00