Manufacturing method of laser processed parts, and pressure-sensitive adhesive sheet for laser processing used for the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8778118
APP PUB NO 20100273313A1
SERIAL NO

12820375

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method of laser processed parts in which at least a pressure-sensitive adhesive layer is provided on a base material as a pressure-sensitive adhesive sheet for laser processing, using a material having specified physical properties. This method comprises adhering the pressure-sensitive adhesive sheet for laser processing to the laser beam exit side of the work by way of the pressure-sensitive adhesive layer, processing the work by irradiating the work with a laser beam of within 2 times of the irradiation intensity for forming a through-hole in the work, at higher than the irradiation intensity of threshold for inducing ablation of the work, and peeling the pressure-sensitive adhesive sheet for laser processing from the work after the machining. Therefore, contamination of the work surface by decomposition products can be effectively suppressed, and laser processed parts can be manufactured easily and at high production efficiency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NITTO DENKO CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hino, Atsushi Ibaraki, JP 34 593
Matsumura, Takeshi Ibaraki, JP 311 2853
Matsuo, Naoyuki Ibaraki, JP 39 237
Takahashi, Tomokazu Ibaraki, JP 52 483
Urairi, Masakatsu Ibaraki, JP 17 243
Yamamoto, Syouji Ibaraki, JP 5 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 15, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00