Cross-linked polyolefin composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8779063
APP PUB NO 20130096261A1
SERIAL NO

13806710

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cross-linked composition, obtained by cross-linking polyolefin composition comprising, all percentages being by weight:

    A) from 5 to 38% of a polypropylene component;B) from 35 to 85% of a copolymer of ethylene with propylene, containing from 42 to 70% of ethylene and having solubility in xylene at room temperature greater than 50%;C) from 5 to 45% of a polymer composition comprising a blend of: i) from 20 to 80% of an ethylene copolymer having a Shore A hardness value equal to or lower than 90 points and containing up to 45% of at least one α-olefin comonomer, provided that, when propylene is present as comonomer, such copolymer i) has a composition which is different from B);ii) from 20 to 80% of a propylene copolymer having a Shore A hardness value equal to or lower than 90 points and containing up to 40% of at least one α-olefin comonomer; wherein the amounts of A), B) and C) are referred to the total weight of A)+B)+C) and the amounts of i) and ii) are referred to the weight of C).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BASELL POLIOLEFINE ITALIA S.R.L.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goberti, Paolo Ferrara, IT 22 103
Hisanaga, Yukihiro Kawasaki, JP 11 154
Minowa, Kazuhiko Kawasaki, JP 11 75
Pellegatti, Giampaolo Boara, IT 64 227

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 15, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00