Electron beam wafer inspection system and method of operation thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8785879
SERIAL NO

13945299

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electron beam wafer imaging system is described. The system includes an emitter for emitting an electron beam; a power supply for applying a voltage between the emitter and the column housing of at least 20 kV; an objective lens for focusing the electron beam on a wafer, wherein the magnetic lens component and the electrostatic lens component substantially overlap each other, wherein the electrostatic lens component has a first electrode, a second electrode and a third electrode; and a control electrode positioned along an optical axis from the position of the third electrode to the position of a specimen stage, wherein the control electrode is configured for control of signal electrons; a controller to switch between a first operational mode and a second operational mode, wherein the controller is connected to a further power supply for switching between the first operational mode and the second operational mode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ICT INTEGRATED CIRCUIT TESTING GESELLSCHAFT FÜR HALBLEITERPRÜFTECHNIK MBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frosien, Jürgen Riemerling, DE 34 295

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 22, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00