Steam generation process for enhanced oil recovery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8789608
APP PUB NO 20100170453A1
SERIAL NO

12635597

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The system and method for steam production for extraction of heavy bitumen includes a method of mixing fuel and oxidizing gases, combusting the mixture, mixing combustion gas with water containing solids and organics, separating solids, using heat from the separated gas to produce distilled water, recycling the distillation facility brine with the combustion gas and removing solids thereof, generating steam from the distilled water and injecting the steam through an injection well or using it above ground for oil recovery. The system includes a combustion boiler, a direct contact steam generator, a gas-solids separator, and a heat exchanger with a water treatment facility like a distillation facility. The water feed of the present invention can be water separated from produced oil and/or low quality water salvaged from industrial plants, such as refineries and tailings as make-up water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EX-TAR TECHNOLOGIES INC640 WOODBINE BLVD WOODBINE SW CALGARY ALBERTA T2W4W4

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Betzer-Zilevitch, Maoz SW Calgary, CA 4 177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 29, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00