Method of producing microstructure of nitride semiconductor and photonic crystal prepared according to the method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8791025
APP PUB NO 20110237077A1
SERIAL NO

13002627

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The method of producing a GaN-based microstructure includes a step of preparing a semiconductor structure provided with a trench formed in a main surface of the nitride semiconductor and a heat-treating mask covering a main surface of the nitride semiconductor excluding the trench, a first heat-treatment step of heat-treating the semiconductor structure under an atmosphere containing nitrogen element to form a crystallographic face of the nitride semiconductor on at least a part of a sidewall of the trench, a step of removing the heat-treating mask after the first heat-treatment step and a second heat-treatment step of heat-treating the semiconductor structure under an atmosphere containing nitrogen element to close an upper portion of the trench on the sidewall of which the crystallographic face is formed with a nitride semiconductor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CANON KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoshino, Katsuyuki Tokyo, JP 15 3649
Kawashima, Shoichi Kawasaki, JP 10 52
Kawashima, Takeshi Tokyo, JP 62 928
Nagatomo, Yasuhiro Kawasaki, JP 37 571

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 29, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00