Methods and devices for backward congestion notification

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8792352
APP PUB NO 20110273983A1
SERIAL NO

13101870

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides improved methods and devices for managing network congestion. Preferred implementations of the invention allow congestion to be pushed from congestion points in the core of a network to reaction points, which may be edge devices, host devices or components thereof. Preferably, rate limiters shape individual flows of the reaction points that are causing congestion. Parameters of these rate limiters are preferably tuned based on feedback from congestion points, e.g., in the form of backward congestion notification (“BCN”) messages. In some implementations, such BCN messages include congestion change information and at least one instantaneous measure of congestion. The instantaneous measure(s) of congestion may be relative to a threshold of a particular queue and/or relative to a threshold of a buffer that includes a plurality of queues.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CISCO TECHNOLOGY, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alaria, Valentina San Francisco, US 9 339
Baldini, Andrea San Francisco, US 6 469
Bergamasco, Davide Sunnyvale, US 21 1046
Bonomi, Flavio Palo Alto, US 48 1976
Pan, Rong Sunnyvale, US 88 2368

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 29, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00